At mature nodes leakage is small and dynamic power dominates, so effort goes into activity reduction and clock gating. Power gating buys little and costs area and complexity.
Below 28 nm leakage becomes a first-order contributor, particularly at temperature, and a part that idles for most of its duty cycle can burn most of its energy doing nothing. Power gating and multi-threshold libraries stop being refinements and become the primary technique.
This is one of several reasons node selection is an architecture decision rather than a procurement one. A long-lifecycle industrial part that spends its life idling may well use less energy at 90 nm than at 16 nm, which is the opposite of the intuition.