01
Architecture and feasibility
Requirements captured, partitioning agreed, power, area and performance budgets set, IP and node selected, risks named early rather than discovered at signoff.
02
RTL and verification
Design and testbench developed in parallel. Coverage tracked from the first week, not assembled at the end.
03
DFT and synthesis
Test structures inserted and validated. Synthesis constraints developed against the real timing intent.
04
Physical implementation
Floorplan, place and route, clock tree, closure across corners and modes, signoff on timing, power integrity and physical verification.
05
Tapeout and bring-up
Handoff package assembled, mask release supported, silicon bring-up and characterisation planned before parts return.
06
Production transition
Test program, yield analysis, qualification support and long-term lifecycle engineering.